Sample — 1930s semi-detached retrofit (mock)

EPC C → B target · fabric-first + ASHP + solar · ROI north star

Archetype
1930s cavity semi-detached
EPC target
CB
Floor area
92
Confidence
Medium-low — many estimated fabric assumptions

Loft: 150 → 300 mm target

Glazing: ~24% floor area (south + west) — Part O early review

Plant: ASHP + MVHR with summer bypass · 6.5 kWp PV + 10 kWh battery planned

Download this mock brief as JSON, Markdown, or PDF — planning aid only, not a certified export.

Retrofit-specific risks

Moisture risk
Solid walls and internal insulation need hygrothermal review — never assume dry lining is low-risk.
Traditional / solid-wall construction
Breathable approaches and ventilation strategy must align with wall build-up.
Resident in place
Staged works and disruption sensitivity affect sequencing and cost.
Heritage constraints
Listed or conservation-area limits may block external insulation — document alternatives early.
PAS-style evidence prompts
Role clarity for assessor, coordinator, and installer — planning aid only, not formal PAS compliance.
Glazing risk: LowThermal mass opportunity: MediumSolar potential: MediumCooling load flag: Low
Beta — Planning viewretrofitefficient electrified

Preference-aligned pathway "Efficient Electrified" — readiness not evaluated; preference order only (score unchanged).

Envelope targets

  • walls: U ≤ 0.15 W/m²K (concept target) Source
  • roof: U ≤ 0.12 W/m²K (concept target) Source
  • airtightness: ≤ 1.0 ACH @ 50 Pa (design target) Source
  • glazing: Balance g-value and Uw by orientation; avoid overglazing south façades Source
  • floor: Confirm existing floor U-value before extension junction design Source

Risk flags

  • [medium] Overglazing riskLarge unshaded south glazing increases overheating before heating load drops.
  • [medium] Thermal bridge detailingJunctions at balconies, corners, and extension ties need explicit psi-value strategy.
  • [medium] Occupied retrofit sequencingPlan phased works to limit dust, noise, and heating outages while residents remain in place.

This pack is design-stage decision support from Evolving Home. It is not a SAP calculation, PHPP balance, HEM assessment, or Energy Performance Certificate. A qualified On Construction Domestic Energy Assessor (or PHPP consultant) must produce the authoritative compliance model for Building Regulations and/or Passive House certification.

Passive House (PHPP) certification and UK Building Regulations (SAP/HEM) are separate workflows. This brief supports early design intent only.

Research & sources

Linked, not compliance proof

Indicative quantity ranges

Planning bands only — not SAP, PHPP, or HEM model outputs. Verify with qualified assessor.

Peak heat loss
5–10 kW (indicative peak, not SAP/PHPP)
Annual demand band
4025–6325 kWh/yr space heating/cooling demand band
Overheating basis
Moderate — confirm with orientation and glazing schedule
PV indicative range
3.7–6.4 kW roof PV indicative range (subject to shading and roof area)
Ventilation assumption
Whole-house MVHR when airtightness target ≤ 1.5 ACH50
Confidence
Low — north-star and defaults only; pathway: efficient electrified

Staged retrofit sequence

Demo planning view
  1. 1
    1. Verify first

    Moisture survey, EPC lodgement check, asbestos/damp flags before fabric changes.

  2. 2
    2. Low-regret fabric

    Loft/top-up, draught reduction, targeted glazing — avoid trapping moisture in solid walls.

  3. 3
    3. Ventilation strategy

    Plan MVHR or balanced ventilation before major airtightness gains.

  4. 4
    4. Heating transition

    Right-size ASHP after fabric improvements; avoid oversizing on pre-improvement loss.

  5. 5
    5. Solar / storage / flex

    PV and battery after demand profile is understood; label export assumptions.

  6. 6
    6. Post-works monitoring

    Smart meter or sensor upload to improve Evidence Grade — planned capability.

Verify first

  • Loft depth and access — measure before insulation target
  • Cavity wall fill suitability — borescope or pilot holes
  • Suspended timber floor — ventilation path and moisture risk
  • Asbestos / damp survey before invasive fabric works
  • Existing heating emitters sized for future ASHP loads

Staged retrofit prompts

  • Whole-dwelling assessment before measure selection (PAS 2035-style prompts — not PAS certification)
  • Ventilation strategy after airtightness improvements
  • Resident-in-place phasing and disruption windows
  • Post-works monitoring and commissioning evidence

Evidence ladder

Recommendations sharpen as facts move from estimated → known. Score confidence bands reflect the same honesty.

Known

Client-stated floor area, confirmed build type

Estimated

U-values from archetype; glazing ratio from concept drawings

Missing

Blower-door result, loft depth, wall construction confirmation

What improves confidence: site survey, EPC lodgement, blower-door test, measured post-occupancy data (planned).

Compliance-adjacent checks

Flags for professional review — Evolving Home does not sign off Part L, Part O, SAP, PHPP, or HEM.

IssueWhy it mattersWho verifiesEvidenceNext action
Part L / energy performancePart LFabric and plant choices affect notional vs actual performance path.SAP / HEM assessor or regional equivalentassumedLock U-value targets and confirm assessment route at technical design
Ventilation strategyVentilationMVHR requires airtightness QA and summer bypass planning.Ventilation designer / assessorassumedDocument intended ventilation route and extract strategy
Heating plant sizingHeatingHeat pump sizing must follow fabric-first heat loss, not rule-of-thumb.Heating engineer / MCS installerassumedAlign with Air-source heat pump sized after heat loss — low-temperature distribution…
Moisture & solid-wall retrofitMoistureSolid walls need breathable or verified safe insulation strategy.Retrofit coordinator / moisture-risk assessorpartialConfirm wall build-up and monitoring plan before insulation install
Design intent onlyDesign intentEvolving Home does not lodge SAP, PHPP, or HEM files.Qualified assessorassumedExport intent pack and schedule formal modelling

Client meeting one-pager

Plain EnglishPlanning aid

Share with clients before consultant appointments — highlights intent, risks, and decisions without certification language.

For your 92 m² retrofit (EPC C) · M23 2LN — ROI north star

Stage investments by payback confidence; electrify heating only after fabric targets are set. This brief ranks pathways for your stated priority — it does not replace accredited energy modelling.

Top risks to discuss

  • Overglazing riskLarge unshaded south glazing increases overheating before heating load drops.
  • Thermal bridge detailingJunctions at balconies, corners, and extension ties need explicit psi-value strategy.
  • Occupied retrofit sequencingPlan phased works to limit dust, noise, and heating outages while residents remain in place.

Client decisions

  • Residents stay during works — phased rooms and disruption windows
  • EPC starting point (C) — agree target band and measure priority with client
  • Plant change: heat pump air — confirm radiator/emitter upgrade scope
  • North-star priority: roi — shapes pathway ranking in this brief

Consultant verification next steps

  • Book SAP / HEM assessor early — confirm notional vs actual specification path
  • Schedule overheating screening for primary living rooms and high-glazing façades
  • Verify wall construction and moisture risk before insulation specification
  • Agree resident-in-place phasing with contractor before tender

This pack is design-stage decision support from Evolving Home. It is not a SAP calculation, PHPP balance, HEM assessment, or Energy Performance Certificate. A qualified On Construction Domestic Energy Assessor (or PHPP consultant) must produce the authoritative compliance model for Building Regulations and/or Passive House certification.

Consultant handoff preview

Live previewPreview only

For your 92 m² retrofit (EPC C) · M23 2LN — ROI north star. Illustrative pack contents — not a lodged SAP, PHPP, or HEM file. Pro exports include versioned assumptions from your saved project.

Project assumptions

  • ·For your 92 m² retrofit (EPC C) · M23 2LN — ROI north star
  • ·Recommended pathway (preference-ranked): efficient electrified — unknown
  • ·Climate profile: Temperate (UK)
  • ·Occupied retrofit — phased sequencing and dust/noise constraints apply

Envelope & glazing

  • ·walls: U ≤ 0.15 W/m²K (concept target)
  • ·roof: U ≤ 0.12 W/m²K (concept target)
  • ·airtightness: ≤ 1.0 ACH @ 50 Pa (design target)
  • ·glazing: Balance g-value and Uw by orientation; avoid overglazing south façades
  • ·floor: Confirm existing floor U-value before extension junction design

Evidence gaps

  • ·Year built not confirmed — heritage and construction assumptions provisional
  • ·No blower-door test scheduled — airtightness target is design intent only

Questions for SAP / HEM assessor

  • ·Confirm notional vs actual specification path
  • ·Overheating screening method for primary living rooms
  • ·Renewable contribution accounting if PV included later

Questions for PHPP consultant

  • ·Thermal bridge Psi-values for preferred junction details
  • ·Heating/cooling load after fabric specification locked
  • ·Ventilation summer bypass strategy with MVHR