Key assumptions, evidence gaps, and verification hooks for consultant handoff.
Project assumptionsEstimated
For your 96 m² retrofit (EPC D) — ROI north star
Project assumptionsEstimated
Recommended pathway (preference-ranked): efficient electrified — unknown
Project assumptionsEstimated
Climate profile: Temperate (UK)
Project assumptionsEstimated
Occupied retrofit — phased sequencing and dust/noise constraints apply
Envelope & glazingEstimated
walls: U ≤ 0.15 W/m²K (concept target)
Envelope & glazingEstimated
roof: U ≤ 0.12 W/m²K (concept target)
Envelope & glazingEstimated
airtightness: ≤ 1.0 ACH @ 50 Pa (design target)
Envelope & glazingEstimated
glazing: Balance g-value and Uw by orientation; avoid overglazing south façades
Envelope & glazingEstimated
floor: Confirm existing floor U-value before extension junction design
Evidence gapsMissing
Site location not confirmed — climate and orientation assumptions provisional
Evidence gapsMissing
Solid-wall construction — moisture-risk review before insulation specification
Evidence gapsMissing
Year built not confirmed — heritage and construction assumptions provisional