Back to architect homeSample project — mock data

Sample — 3-bed semi-detached (mock)

Energy independence north star · SW postcode archetype

Evidence grade
C
Confidence
Medium — mostly estimated
Floor area
118

Download this mock brief as JSON, Markdown, or PDF — planning aid only, not a certified export.

Glazing risk: LowThermal mass opportunity: MediumSolar potential: HighCooling load flag: Low
Beta — Planning viewnew buildactive roof

Preference-aligned pathway "Active Roof" — readiness not evaluated; preference order only (score unchanged).

Envelope targets

  • walls: U ≤ 0.18 W/m²K (concept target) Source
  • roof: U ≤ 0.12 W/m²K (concept target) Source
  • airtightness: ≤ 1.0 ACH @ 50 Pa (design target) Source
  • glazing: Balance g-value and Uw by orientation; avoid overglazing south façades Source

Risk flags

  • [medium] Overglazing riskLarge unshaded south glazing increases overheating before heating load drops.
  • [medium] Thermal bridge detailingJunctions at balconies, corners, and extension ties need explicit psi-value strategy.

This pack is design-stage decision support from Evolving Home. It is not a SAP calculation, PHPP balance, HEM assessment, or Energy Performance Certificate. A qualified On Construction Domestic Energy Assessor (or PHPP consultant) must produce the authoritative compliance model for Building Regulations and/or Passive House certification.

Passive House (PHPP) certification and UK Building Regulations (SAP/HEM) are separate workflows. This brief supports early design intent only.

Research & sources

Linked, not compliance proof

Indicative quantity ranges

Planning bands only — not SAP, PHPP, or HEM model outputs. Verify with qualified assessor.

Peak heat loss
5–10 kW (indicative peak, not SAP/PHPP)
Annual demand band
4130–6490 kWh/yr space heating/cooling demand band
Overheating basis
Moderate — confirm with orientation and glazing schedule
PV indicative range
4.7–8.3 kW roof PV indicative range (subject to shading and roof area)
Ventilation assumption
Whole-house MVHR when airtightness target ≤ 1.5 ACH50
Confidence
Medium — multiple inputs captured; pathway: active roof

North-star comparison

Re-ranks narrative — score unchanged unless inputs change
Energy independence

Pathway order: Active Roof → Ground-Coupled

Size solar and storage after demand reduction; plan for future battery and EV integration.

Risk focus: Grid export and battery economics uncertain at concept

Sustainability

Pathway order: Efficient Electrified → Ground-Coupled

Lock envelope performance and thermal bridge strategy at concept stage; compare embodied vs operational tradeoffs.

Risk focus: Embodied carbon tradeoffs need LCA review

ROI

Pathway order: Efficient Electrified → Active Roof

Stage investments by payback confidence; electrify heating only after fabric targets are set.

Risk focus: Payback bands directional only — not quoted here

Max-techExperimental

Pathway order: Active Roof → Ground-Coupled

Treat advanced controls and grid services as layered options — never substitutes for envelope fundamentals.

Risk focus: Higher uncertainty — experimental controls and VPP

Design-stage scenarios

Compare options at concept — demo planning view; not a lodged compliance model.

Baseline / compliant-minimum

Meet regulatory intent with lowest upfront disruption — acceptable for tight budgets.

Medium confidence
Main moves
  • · Target Part L notional building U-values at concept
  • · Standard double glazing; MVHR deferred
  • · ASHP sized on preliminary heat loss
Risks: Overheating on south rooms; Higher lifetime bills vs fabric-first; Future retrofit harder

Fabric-first low-risk

Lock envelope performance early; smallest plant for long-run comfort.

Medium confidence
Main moves
  • · U ≤ 0.15 walls/roof concept targets
  • · Airtightness ≤ 1.0 ACH50 design intent
  • · Balanced glazing with shading strategy
  • · MVHR with summer bypass
Risks: Cost premium vs baseline; Thermal bridge detailing at junctions

Efficient electrified / PV-ready

Electrify heat and hot water with roof optimised for self-consumption.

Low confidence
Main moves
  • · Fabric-first envelope (moderate ambition)
  • · ASHP + cylinder sized after demand reduction
  • · South/east-west roof reserved for ~4–6 kWp
  • · Future battery / EV circuit provision
Risks: Oversizing PV before demand reduction; Grid export assumptions

Evidence ladder

Recommendations sharpen as facts move from estimated → known. Score confidence bands reflect the same honesty.

Known

Client-stated floor area, confirmed build type

Estimated

U-values from archetype; glazing ratio from concept drawings

Missing

Blower-door result, loft depth, wall construction confirmation

What improves confidence: site survey, EPC lodgement, blower-door test, measured post-occupancy data (planned).

Compliance-adjacent checks

Flags for professional review — Evolving Home does not sign off Part L, Part O, SAP, PHPP, or HEM.

IssueWhy it mattersWho verifiesEvidenceNext action
Part L / energy performancePart LFabric and plant choices affect notional vs actual performance path.SAP / HEM assessor or regional equivalentpartialLock U-value targets and confirm assessment route at technical design
Ventilation strategyVentilationMVHR requires airtightness QA and summer bypass planning.Ventilation designer / assessorpartialConfirm ACH target and MVHR summer bypass with assessor
Heating plant sizingHeatingHeat pump sizing must follow fabric-first heat loss, not rule-of-thumb.Heating engineer / MCS installerpartialAlign with Air-source heat pump sized after heat loss — low-temperature distribution…
Design intent onlyDesign intentEvolving Home does not lodge SAP, PHPP, or HEM files.Qualified assessorassumedExport intent pack and schedule formal modelling

Client meeting one-pager

Plain EnglishPlanning aid

Share with clients before consultant appointments — highlights intent, risks, and decisions without certification language.

For your 118 m² semi project · BS8 1QU — Energy independence north star

Size solar and storage after demand reduction; plan for future battery and EV integration. This brief ranks pathways for your stated priority — it does not replace accredited energy modelling.

Top risks to discuss

  • Overglazing riskLarge unshaded south glazing increases overheating before heating load drops.
  • Thermal bridge detailingJunctions at balconies, corners, and extension ties need explicit psi-value strategy.

Client decisions

  • Balance daylight and heat loss with orientation-aware glazing
  • Heating route: ashp — confirm emitter sizing after fabric targets lock
  • Ventilation: whole-house MVHR — align with airtightness target
  • Budget sensitivity (balanced) — trade-offs between fabric depth and plant complexity
  • North-star priority: energy independence — shapes pathway ranking in this brief

Consultant verification next steps

  • Book SAP / HEM assessor early — confirm notional vs actual specification path
  • Schedule overheating screening for primary living rooms and high-glazing façades
  • Lock envelope U-values and airtightness QA plan before plant sizing
  • Model renewable contribution and storage assumptions with assessor

This pack is design-stage decision support from Evolving Home. It is not a SAP calculation, PHPP balance, HEM assessment, or Energy Performance Certificate. A qualified On Construction Domestic Energy Assessor (or PHPP consultant) must produce the authoritative compliance model for Building Regulations and/or Passive House certification.

Consultant handoff preview

Live previewPreview only

For your 118 m² semi project · BS8 1QU — Energy independence north star. Illustrative pack contents — not a lodged SAP, PHPP, or HEM file. Pro exports include versioned assumptions from your saved project.

Project assumptions

  • ·For your 118 m² semi project · BS8 1QU — Energy independence north star
  • ·Recommended pathway (preference-ranked): active roof — unknown
  • ·Climate profile: Temperate (UK)
  • ·2 storeys (design intent)
  • ·Budget sensitivity: balanced

Envelope & glazing

  • ·walls: U ≤ 0.18 W/m²K (concept target)
  • ·roof: U ≤ 0.12 W/m²K (concept target)
  • ·airtightness: ≤ 1.0 ACH @ 50 Pa (design target)
  • ·glazing: Balance g-value and Uw by orientation; avoid overglazing south façades
  • ·Glazing: ~18% floor area — balanced glazing

Evidence gaps

  • ·Loft depth / roof build-up not verified on site
  • ·No blower-door test scheduled — airtightness target is design intent only

Questions for SAP / HEM assessor

  • ·Confirm notional vs actual specification path
  • ·Overheating screening method for primary living rooms
  • ·Renewable contribution accounting and battery assumptions

Questions for PHPP consultant

  • ·Thermal bridge Psi-values for preferred junction details
  • ·Heating/cooling load after fabric specification locked
  • ·Ventilation summer bypass strategy with MVHR